Monday, May 4, 2009

Taking Shape






We thought the rain was over.  Not quite.  But, we are forging ahead and the house is taking it's three dimensional shape.  The master suite is framed and the back wall of the garage is up.  The two other buildings, the pool house and the studio building have ceilings and have achieved house like qualities.  Tim has a camera on the site and is doing a time lapse film of the project which is very entertaining so far.  The photos are of the stairs from the pool up to the house level, the master suite framed, the studio building and, of course, the camera.  Also a view out of the gym looking south over the meadow and vineyard.